Contract Review – Source
The quality monitoring of Zhongtai starts from the contract review involving various departments, and plans are made from various aspects such as technical implementation, time control, and quality supervision, with unified goals and collaborative implementation.
Core – Production scheduling
Reasonable production arrangements affect the quality of equipment, therefore, ensuring the “core pass” is of utmost importance in achieving high-quality welded pipe equipment products. Through effective intelligent control system layout, promote the transformation of manufacturing methods towards digitization, refinement, and flexibility.
Workpiece coding – key
To achieve traceability of finished products and components, responsibility is assigned to individuals. At the same time, in order to improve the corresponding operation and usage efficiency of components, Zhongtai’s components are uniformly coded, with consistent coding positions, fonts, and sizes. The coding is clear and easy to view, without affecting surface corrosion resistance and usability. Each component has its own manufacturer’s seal and ID code.
Guarantee – Acceptance and Delivery
The completion of equipment manufacturing and installation requires collaborative acceptance from various departments such as technology, production, quality inspection, and sales to ensure no errors or defects.
Post time: Jun-24-2024